✕
Home Submit a Project Join as Operator Find Operators Operators by City About Us Operators & Owner-Operators Contractors & Homeowners Contact Login
Home / Houston / Driveway grading

Driveway grading in Houston: local operators and what it costs

Driveway grading around Houston usually means reshaping a gravel drive that holds puddles, building up a base on soft clay for concrete, or fixing a low entrance where the drive meets the street. Most of the work is on your own lot, but the point where it meets the street needs its own permit. This page covers that permit, the drainage problem on flat clay, the dig-safe rule, and a typical local cost.

Post your project free

Paid member operators who cover the region see your project and can contact you directly, and annual members get an instant email alert.

What driveway grading costs in Houston

$1,500 to $5,900 for a typical 500 to 1,000 square foot driveway

Based on Pro Operator Network's national driveway grading cost guide, checked against published cost guides, and adjusted to the Houston-Pasadena-The Woodlands metro area using its 2024 price level from the U.S. Bureau of Economic Analysis (98.6, where the U.S. average is 100).

A typical range, not a quote. Your own price depends on your property and is set by whoever takes on your project.

Where the drive meets the street

Houston's code says no one may build a driveway that joins private property to a public street without a written permit from the city engineer at Houston Public Works. If the grading reaches the apron or changes where the drive meets the street, that permit applies. Digging in the sidewalk or drainage area out front is also limited to permit holders.

Getting water off a flat drive

The clay soils common around Houston drain very slowly and sit on ground that is nearly level. A drive graded dead flat holds water in every low spot, which softens the base and starts potholes. Building a slight crown or a steady fall toward the street or a side swale, even a small one, keeps water moving off the surface.

A base that will hold on clay

Clay that is wet when the base goes down will pump up through the rock under traffic. Grading when the ground is dry, cutting out soft spots, and placing crushed rock in compacted layers gives the surface something firm to sit on. Houston averages about fifty-two inches of rain a year, with June, October and May the wettest months, so plan around them.

Fill and flood zones

Raising a low drive with new material counts as fill. Houston Public Works lists fill three feet or deeper, or more than fifty cubic yards on a lot, as needing a permit, and no fill is allowed in the public right-of-way. In a special flood hazard area, grading and paving also need a floodplain development permit.

Texas 811

Service lines for water and gas often run under the edge of a drive. Homeowners in Texas must notify 811 two business days before digging, excluding weekends and holidays, so put in a request before the grading starts.

For your project post

Give the length and width of the drive, its surface now and what goes on top after, where water stands, whether the apron at the street is included, and any material to bring in or haul away.

Run equipment in Houston?

25 operators on Pro Operator Network cover Texas.

Own a skid steer in Houston? This is what people here pay for this job. Join free and get these projects.

Join free

1 project posted near Houston in the last 30 days

Contact Us